This initial technical report reviews the current issues with the Gardiner Expressway, and presents an overall description of the new proposal to replace the elevated section with a cable-stayed viaduct structure.
Report: Replacing the Gardiner

A detailed PowerPoint Presentation called "Reconnecting our city" can be downloaded by clicking on the link below. 

WARNING: the presentation is very large and has been ZIPPED (requires WinZip to unzip).
 
RECONNECTING OUR CITY

home